Columbus not for the first time found ourselves on a new build dealership installing a BIOCLASSIC system to reduce water consumption from the busy car wash area.
Working closely with the architect our technical team designed a system above ground to utilise space in a small plant room located opposite the wash bay.
Our team of engineers along with our partners Wasserschmidt’s engineer “Felix” completed the project in 4 days. ”
This site is now benefitting from a saving of approximately 90% in water consumption.
Every system is designed to ensure its compatible with all makes and models of jet wash equipment . Calibrated to deal with flow and pressure of hot and cold water high pressure equipment .